[1]
Azevedo Eleutério, A. et al. 2019. MWO Line Optimization Applying Lean Manufacturing Methodology: PIM Case Study. International Journal for Innovation Education and Research. 7, 11 (Nov. 2019), 776–787. DOI:https://doi.org/10.31686/ijier.vol7.iss11.1932.