Performance Analysis of E-Band 70/80 GHz Frequency Segment for Point to Point Gigabit Connectivity
DOI:
https://doi.org/10.31686/ijier.vol4.iss4.526Abstract
The commercial viability for E-Band spectrum has attracted a lot of research for the last decade in order to find economic wireless gigabit connectivity that can complement fiber optic cable. This paper has analyzed the usefulness of E-Band point-to-point microwave link in providing wireless backhaul capacities comparable to that of fiber optic cable. In particular, microwave links that utilize the E-band frequencies were set up in three different cities in Kenya i.e. Mombasa (Latitude 04 01 24.10 S, Longitude 039 37 35.10 E) and validated the acceptable propagation and performance of millimeter wave links at E-Band frequencies for distances within and well above the promised limits in the existing literature. Daily occurrences of signal losses closely match the rainfall pattern, and this has been used to further validate the practicality of the experiments. These experiments were successful in verifying that E-Band can be used in Kenya for short range backhaul connectivity and in slightly over stretched path lengths of 3-6 km under clear atmospheric conditions.
References
FCC Office of Engineering and Technology Bulletin 70, “Millimeter Wave Propagation: Spectrum Management Implications,” July 1997.
Pejman Ghorbanzade, “An introduction to Millimeter Waves Characteristics, Applications and Future Trends” September 2012
FCC Notice of Proposed Rule Making 02-180, “Allocations and Service Rules for the 71-76 GHz, 81-86 GHz, and 92-95 GHz Bands,” June 2002
FCC Report and Order 03-248, “Allocations and Service Rules for the 71-76GHz, 81-86 GHz, and 92-95 GHz Bands,” November, 2003; and FCC Memorandum Opinion and Order 05-45, March, 2005.
ECC/CEPT Recommendation (05)07, “Radio frequency channel arrangements for fixed service systems operating in the bands 71-76 GHz and 81-86 GHz”, October 2005.
ETSI TS 102 524, “Fixed Radio Systems; Point-to-Point equipment; Radio equipment and antennas for use in Point-to-Point Millimeter Wave applications in the Fixed Services (mmwFS) frequency bands 71 GHz to 76 GHz and 81 GHz to 86 GHz,” July 2006.
ITU Radio Regulations manual[8] Communications Commission of Kenya, “Kenya Table of Radio Frequency Allocation”, 2008 Edition
www.EXFO.com, “Telecom Test and Measurement: Application Note 183”
Jonathan Wells, “E-Band Licensing and License Fee Considerations”
Alexander Lebedev, Xiaodan Pang, J. J. Vegas Olmos, Marta Beltra´n, Roberto Llorente, Søren Forchhammer, Idelfonso Tafur Monroy, “Feasibility Study and Experimental Verification of Simplified Fiber-Supported 60-GHz Pico cellMobile Backhaul Links” Volume 5, Number 4, August 2013 DOI: https://doi.org/10.1109/JPHOT.2013.2277011
ITU-R Recommendation P.525
ITU-R Recommendation P.453-9
ITU-R Recommendation P.530-7/8
ITU-R Recommendation P.837-1
ITU-R Recommendation P.838-1
Md. Rakib Al Mahmud, ZaighamShabbir Khan, “Analysis and Planning Microwave Link to Established Efficient Wireless Communications”September 2009
Richard U. Laine, Harris Communications, “Digital Microwave Link Engineering”Vol. I, Issue 16, March 2006
https://www.telent.de/fileadmin/_migrated/content_uploads/MINI-LINK_TN_R5_ETSI_datasheet.pdf
Jonathan Wells, “E-band Wireless Technology”
Downloads
Published
Issue
Section
License
Copyright (c) 2016 Stephen Arato Sewe, Vitalice Kalecha Oduol
![Creative Commons License](http://i.creativecommons.org/l/by-nd/4.0/88x31.png)
This work is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.
Copyrights for articles published in IJIER journals are retained by the authors, with first publication rights granted to the journal. The journal/publisher is not responsible for subsequent uses of the work. It is the author's responsibility to bring an infringement action if so desired by the author for more visit Copyright & License.