A Development of PaDLeSS approach for part disposal reduction in aircraft composite manufacturing
DOI:
https://doi.org/10.31686/ijier.vol5.iss12.55Keywords:
PaDLeSS approach, aircraft composite panel, lean, six sigma, Kaizen, Cause & Effect diagramAbstract
This paper focus on a development and implementation of a systematic guided lean and six-sigma approach to solve high rejection rate on part disposal at composite manufacturing for aircraft component industry. The approach is called PaDLeSS which is stand for Part Disposal reduction through Lean and Six Sigma. PaDLeSS is developed from the integration between lean and six sigma tools with a guided by R-DMAIC-S approach and it is focused on the reduction of parts disposal mainly at a composite manufacturing panel for aircraft components. Since a unit price for one composite panel of aircraftcomponent is very high, a systematic approach to improve, control and sustain the process is necessary in order to reduce parts rejection rate in the process, outgoing process and at the customer process. PaDLeSS is devided into two main phases ; development phase and implementation phase. In a development phase, a thorough study was carried out from previous works and match with a requirement needed in part disposal reduction at composite manufacturing for an aircraft panel. The related data related to the parts disposal at the manufacturing line was also analyzed to get actual situation for improvement monitoring. Then, in the implementation phase, a few case studies selected at company A (composite panel for aircraft manufacturing company in Malaysia) for verification and validation purposes. In this paper, the development of PaDLeSS will be presented.
References
Bill Carreira, 2006, Lean Six Sigma That Works, Amacom, New York
Vivekananthamoorthy N & Sankar S, 2010, Lean Six Sigma, Six Sigma Projects and Personal Experiences, ISBN:978-953-307-370-5
Everton D. & Sergio E.G., 2013, Lean, Six Sigma and Lean Six Sigma: an analysis based on operations strategy, International Journal of Production Research
Mark G. & Jagadeesh R., 2011, Double LEAN Six Sigma – A Structurefor Applying Lean Six Sigma, Journal of Applied Business and Economics: vol.12(6)
B.Prida & M.Grijalvo, 2011, Implementing Lean Manufacturing by Means of Action Research Methodology Case Study in the Aeronautics Industry, International Journal of Industrial Engineering, 18(12),611-619
Goddinho M.,Faria F.C., 2009, Strategic Paradigms for Manufacturing Management (SPMM): Key Elements and Conceptual Model , International Journal of Industrial Engineering: Theory, Applications and Practice, 16(2):147-159
Frida A., Astrid H., 2014, Design for Manufacturing of Composite Structures for Commercial Aircraft – the Development of DFM strategy at SAAB Aerostructures, CIRP Conference on Manufacturing System: 17(2014) 362-367 DOI: https://doi.org/10.1016/j.procir.2014.02.053
Alastair K Muir, 2006, Lean Six Sigma Statistics – Calculating Process Efficiencies in Transactional Projects, McGraw-Hill, New York
Pete P & Larry H., 2002, What is Six Sigma, McGraw-Hill, New York
Susan K.L., Dauglas B.S., 2008, Practical Support for Lean Six Sigma Software Process Definition, Wiley, New Jersey
Keki R.B.,2003, The Power of Ultimate Six Sigma, Jaico Publishing House, Mumbai
James W.M., 2007, Lean Six Sigma for Supply Chain Management – The 10 Step Solution Process, McGraw-Hill, New York[13] E.A. Parr, 1998, Industrial Control Handbook, 3rd Ed, Industrial Press, Oxford
Jon D.S., 1999, Evaluation of Hand Lay-Up and Resin Transfer Molding in Composite Wind Turbine Blade Manufacturing, Montana State University-Bozeman
Adan V & Jaime S., 2009, Implementation of Six Sigma in a Manufacturing Process: A Case Study, International Journal of Industrial Engineering: 16(3),171-181
M.White & J.L.Garcia, 2009, Cycle Time Improvement by a Six Sigma Project for the Increase of New Business Accounts, International Journal of Industrial Engineering: 16(3),191-205
Daryl S., 2009, Beyond Six Sigma – A Control Chart for Tracking Defects per Billion Opportunities(dpbo), International Journal of Industrial Engineering: 16(3),227-233
Jerusha M.& Tracy B., Professional Perceptions of Six Sigma’s Value, International Journal of Industrial Engineering: 16(3),234-247
Downloads
Published
Issue
Section
License
Copyright (c) 2017 M.S. Ismail, M.I. Hussain, N. Muhammad, Z. Mohd Zain, R. Ahmad, M.S. F.Soberi
This work is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.
Copyrights for articles published in IJIER journals are retained by the authors, with first publication rights granted to the journal. The journal/publisher is not responsible for subsequent uses of the work. It is the author's responsibility to bring an infringement action if so desired by the author for more visit Copyright & License.