Accelerated Bridge Construction (ABC), A Better Approach to Bridge Construction?
DOI:
https://doi.org/10.31686/ijier.vol4.iss8.577Keywords:
Prefabricated Bridge, modular structure, precast concreteAbstract
Accelerated Bridge Construction (ABC) is a common term given to the combination of different procedures that help reduce the construction period of a project. Utilizing these different procedures on bridge replacement/rehabilitation projects presents several benefits, including reduced traffic congestion and improved on-site safety. The purpose of this paper is to recognize the difference between Accelerated Bridge Construction and Conventional Bridge Construction, and the process of deciding which approach is more suitable for a particular project. Specifically, this paper explores the desirable condition in which utilizing ABC would be most beneficial for the owner, builder, community, and environment. The methodology used in this paper is the content analysis method, which includes a large amount of textual information. The analytical constructs may be obtained from existing practices, experience, knowledge of experts, and previous research studies. Throughout this research, data and information was collected from different scientific articles, research papers, books, and journals. The results conclude that when a project is located in a critical area, and time is a vital factor, the ABC approach can be much more beneficial compared to the conventional approach. However, this method cannot be applicable unless owners have financial capability, skilled and competent workers, and the required specialized equipment for the job. Thus, utilizing prefabrication elements is greatly advantageous, but only when owners have the sufficient recourses.
Downloads
References
AASHTO - AASHTO Innovation Initiative - Self Propelled Modular Transporters. (n.d.). Retrieved May 22, 2016, from http://aii.transportation.org/Pages/SelfPropelledModularTransporters.aspx
ABC - Accelerated - Technologies and Innovations - Construction - Federal Highway Administration. (n.d.). Retrieved April 24, 2016, from http://www.fhwa.dot.gov/bridge/abc/
An inside look at designing for Accelerated Bridge Construction (ABC) - YouTube. (n.d.). Retrieved June 11, 2016, from https://www.youtube.com/watch?v=YBOczUVZ5lc
Babbie, E. R. (2010). The Basics of Social Research. Cengage Learning. Beam Bridge Construction & Design -Types of Beam Bridges. (n.d.). Retrieved May 22, 2016, from http://www.brighthubengineering.com/structural-engineering/62873-what-are-beam-bridges/
Building Foundation Types for Construction Engineering. (2015, December 22). Retrieved from http://harbun.me/building-foundation-types/
Chapter 18 - Suspension Bridges - Suspension-Bridge.pdf. (n.d.). Retrieved from http://www.ams.ir/jozavat/Shegeftiha/Chapter2/Suspension-Bridge.pdf
Chapter 19 - Cable-Stayed Bridges - ch19.pdf. (n.d.). Retrieved from http://freeit.free.fr/Bridge%20Engineering%20HandBook/ch19.pdf
Design Guide for Precast UHPC Waffle Deck Panel System, including Connections | Federal Highway Administration. (n.d.). Retrieved May 2, 2016, from https://www.fhwa.dot.gov/hfl/partnerships/uhpc/hif13032/chap03.cfm
Framework for Decision-Making - ABC - Accelerated - Technologies and Innovations - Construction - Federal Highway Administration. (n.d.). Retrieved May 22, 2016, from http://www.fhwa.dot.gov/bridge/prefab/frameworkflowchart.cfm
Garver - Engineering, Planning, and Environmental Services. (n.d.). Retrieved from https://garverusa.com/
Home | Federal Highway Administration. (n.d.). Retrieved May 1, 2016, from https://www.fhwa.dot.gov/Insecure Connection. (n.d.). Retrieved May 21, 2016, from https://www.fhwa.dot.gov/bridge/prefab/if09010/report.pdf
Khan, M. A. (2014). Accelerated Bridge Construction: Best Practices and Techniques. Elsevier. DOI: https://doi.org/10.1016/B978-0-12-407224-4.00005-8
Mahmoud, K. (2011). Modern Techniques in Bridge Engineering: Proceedings of 6th New York City Bridge Conference, 25-26 July 2011. CRC Press. Manual 11 Design Of Arch Bridges.pdf. (n.d.). Retrieved from http://ebooks.narotama.ac.id/files/ICE%20Manual%20of%20Bridge%20Engineering%20(2th%20Edition)/Manual%2011%20%20Design%20Of%20Arch%20Bridges.pdf DOI: https://doi.org/10.1201/b11340
Microsoft Word - Snabba brobyten och brobyggnationer_Final_II.docx - SBUF 12691 - Slutrapport Snabba brobyten och brobyggnationer.pdf. (n.d.). Retrieved from http://vpp.sbuf.se/Public/Documents/ProjectDocuments/67DF1791-66C1-426B-8B17-371F122316E7/FinalReport/SBUF%2012691%20-%20Slutrapport%20Snabba%20brobyten%20och%20brobyggnationer.pdf
Nadim, A.-H. (2014, May 28). Jeddah will become a “city of bridges and tunnels.” Retrieved May 26,2016, from http://www.arabnews.com/news/577956
National Building Museum. (n.d.). Retrieved from http://www.nbm.org/
NCHRP. (2011). Application of Accelerated Bridge Construction Connections in Moderate-to-High Seismic Regions. Transportation Research Board.
nchrp20-68a_11-02.pdf. (n.d.). Retrieved from http://onlinepubs.trb.org/onlinepubs/nchrp/docs/nchrp20-68a_11-02.pdf
or11005.pdf. (n.d.). Retrieved from https://library.modot.mo.gov/RDT/reports/TRyy0912/or11005.pdf
Post Tensioning Manual - hif13026.pdf. (n.d.). Retrieved from https://www.fhwa.dot.gov/bridge/construction/pubs/hif13026.pdf
Prefabricated/Precast Bridge Elements and Systems (PBES) for Off-System Bridges - BDK83_977-13_rpt[1].pdf. (n.d.-a). Retrieved from http://www.dot.state.fl.us/structures/structuresresearchcenter/Final%20Reports/BDK83_977-13_rpt[1].pdf
Prefabricated/Precast Bridge Elements and Systems (PBES) for Off-System Bridges - BDK83_977-13_rpt[1].pdf. (n.d.-b). Retrieved from http://www.dot.state.fl.us/structures/structuresresearchcenter/Final%20Reports/BDK83_977-13_rpt[1].pdf
Saudi, G. (n.d.). Traffic in Jeddah is nightmarish to say the least. Retrieved May 26, 2016, from http://ara.tv/gvcsb
Shear connection in composite bridge beams. (n.d.). Retrieved May 2, 2016, from http://www.steelconstruction.info/Shear_connection_in_composite_bridge_beams
SPR-687: Analysis of the State of the Art of Precast Concrete Bridge Substructure Systems - AZ687.pdf. (n.d.). Retrieved from https://apps.azdot.gov/ADOTLibrary/publications/project_reports/PDF/AZ687.pdf
Tang, M.-C. (n.d.). Evolution of Bridge Technology. Retrieved from https://www.researchgate.net/publication/228793919_Evolution_of_Bridge_Technology
The Structure of Scientific Revolutions. (n.d.). Retrieved from http://projektintegracija.pravo.hr/_download/repository/Kuhn_Structure_of_Scientific_Revolutions.pdf
Top 10 Saudi Arabian infrastructure projects. (n.d.). Retrieved May 13, 2016, from https://www.thebig5hub.com/galleries/top-10-saudi-arabian-infrastructure-projects/
truss.pdf. (n.d.). Retrieved from https://www.deldot.gov/archaeology/historic_pres/delaware_bridge_book/pdf/truss.pdf
UHPC-filled duct connections for accelerated bridge construction of RC columns in high seismic zones. (n.d.). Retrieved May 26, 2016, from http://www.sciencedirect.com.offcampus.lib.washington.edu/science/article/pii/S0141029615003351
untitled - LivingBridge.pdf. (n.d.). Retrieved from http://vbn.aau.dk/ws/files/18915659/LivingBridge.pdf
Yamane, T., Tadros, M. K., & Baishya, M. C. (1998). Full Depth Precast, Prestressed Concrete Bridge Deck System. PCI Journal, 43(3), 50–66. http://doi.org/10.15554/pcij.05011998.50.66 DOI: https://doi.org/10.15554/pcij.05011998.50.66
Downloads
Published
Issue
Section
License
Copyright (c) 2016 Mishal Ahmad Alashari

This work is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.
Copyrights for articles published in IJIER journals are retained by the authors, with first publication rights granted to the journal. The journal/publisher is not responsible for subsequent uses of the work. It is the author's responsibility to bring an infringement action if so desired by the author for more visit Copyright & License.