Impact of Autonomous Maintenance on a PIM Production Line
DOI:
https://doi.org/10.31686/ijier.vol7.iss12.2084Keywords:
TPM, Autonomous Maintenance, Equipment AvailabilityAbstract
To increase the competitiveness of their products, companies have sought to identify and eliminate losses in their production processes to reduce production costs. One of the six major process losses established by the Total Productive Maintenance (TPM) philosophy is related to equipment downtime in the production environment. This paper analyzes the impacts of the implementation of autonomous maintenance through the eight-step analysis implemented by a project developed in line 3 of the welding sector of a factory located in the city of Manaus, capital of Amazonas, Brazil. To this end, the indicators were evaluated, establishing the solution priority, defining the necessary actions and implementing them. Upon completion of the project, there was a 39% increase in operators' knowledge of machines and autonomous maintenance procedures, as well as a 75% reduction in line equipment downtime, increasing the availability from 94.9% to 98.7%, allowing to verify the effects of the execution of the autonomous maintenance activities.
References
[2] BIEHL, N.C; SELLITO, M. A. TPM e manutenção autônoma: estudo de caso em uma empresa da indústria metal-mecânica. Revista Produção On Line, Florianópolis, SC, v. 15, n. 4, p. 1123 – 1147, out./dez. 2015.
[3] BRANCO, F. G. A Organização, o Planejamento e o Controle da Manutenção. RJ: Ciência Moderna, 2008
[4] GOMES, M.; LIMA, C.; SILVA I. Implantação da Lubrificação Autônoma como Ferramenta Essencial do TPM: Uma Abordagem Prática. Encontro Nacional de Eng. de Produção. Anais. Bento Gonçalves: ABEPRO, 2012.
[5] GRAISA, M.; AL-HABAIBEH, A. An investigation into current production challenges facing the Libyan cement industry and the need for innovative total productive maintenance (TPM) strategy. Journal of Manufacturing Technology Management, v. 22, n.4, p. 541-558, 2011. http://dx.doi.org/10.1108/17410381111126445
[6] GUSMÃO, C. A. Índices de desempenho da manutenção - Um enfoque prático. Disponível em: <http://www.mantenimientomundial.com/notas/4indices.pdf >. Acessado em: 11 dezembro de 2019.
[7] IMAI, M. – Gemba Kaizen: estratégias e técnicas do Kaizen no piso de fábrica. SP: IMAN, 1997.
[8] KARDEC, A.; NASCIF, J. Manutenção - Função Estratégica. Segunda edição. RJ:QualityMark, 2001.
[9] KELLY, A. e HARRIS, M.J. Management of Industrial Maintenance, Butterworths, Oxford, 1978.
[10] KELLY, A. Maintenance Planning and Control, Butterworths, Oxford, 1984.
[11] _________, Maintenance and its Management, Conference Communication, London, 1989.
[12] MOUBRAY, John, Manutenção Centrada em Confiabilidade, 2nd Edition, Aladon Ltd, 2000.
[13] NAKAJIMA, S. Introdução ao TPM - Total Productive Maintenance. São Paulo: IMC Internacional Sistemas Educativos Ltda., 1989.
[14] NAKAZATO, Koichi. Facilitadores TPM – XXXV Evento Internacional de TPM, Tokyo, Japan, JIPM, Impresso pela IMC International, 1998.
[15] SINGH, R.; GOHIL, A.; SHAH, D.; DESAI, S. Total Productive Maintenance (TPM) implementation in a machine shop: A case study. Procedia Engineering, v.51, n.1, 592-599, 2013. http://dx.doi.org/10.1016/j.proeng.2013.01.084
[16] SLACK, N. et al. (1999) Administração da Produção. Ed. Atlas.
[17] SMITH, Anthony M., HINCHCLIFFE, Glenn R., RCM - Gateway to World Class Maintenance, 1st Edition, Elsevier Butterworth-Heinemann, 2004.
[18] SUZUKI, T. TPM in process industries. Portland: Productivity Press, 1994.
[19] TAKAHASHI, Y.; OSADA, T. TPM/MPT: manutenção produtiva total. São Paulo: IMAM, 1993.
[20] TAKAHASHI, Y.; OSADA, T. Manutenção produtiva total. São Paulo: IMAM, 2000
[21] WIREMAN, T. Developing performance indicators for managing maintenance, New York, Industrial Press Inc., 1998.
Downloads
Published
Issue
Section
License
Copyright (c) 2019 Aglei Duques Maciel Filho, Jonas Gomes da Silva, Mariana Sarmanho de Oliveira Lima
This work is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.
Copyrights for articles published in IJIER journals are retained by the authors, with first publication rights granted to the journal. The journal/publisher is not responsible for subsequent uses of the work. It is the author's responsibility to bring an infringement action if so desired by the author for more visit Copyright & License.
How to Cite
Most read articles by the same author(s)
- Jéssica Barbosa da Silva, Jonas Gomes da Silva, Evasion of Industrial Engineering students of FT/UFAM , International Journal for Innovation Education and Research: Vol. 7 No. 10 (2019): International Journal for Innovation Education and Research
- Jonas Gomes da Silva, Juliana da Silva Ferreira, How to evaluate the "Bolsa Universidade" Program in Manaus , International Journal for Innovation Education and Research: Vol. 7 No. 11 (2019): International Journal for Innovation Education and Research
- Jonas Gomes da Silva, Maysa da Silva Teixeira , Causes of Non-Treatment of Nonconformities in a PIM Company X , International Journal for Innovation Education and Research: Vol. 7 No. 11 (2019): International Journal for Innovation Education and Research
- Gustavo Rodrigues Guimarães, Jonas Gomes da Silva, Mariana Sarmanho de Oliveira Lima, How to reduce craters in the painting process of a PIM company? , International Journal for Innovation Education and Research: Vol. 7 No. 12 (2019): International Journal for Innovation Education and Research
- Jonas Gomes da Silva, Participative approach to graduate students evaluate FT/UFAM Services , International Journal for Innovation Education and Research: Vol. 7 No. 11 (2019): International Journal for Innovation Education and Research
- Jonas Gomes da Silva, Amanda Ramos da Costa, Variability reduction in Manaus` beer process production , International Journal for Innovation Education and Research: Vol. 7 No. 11 (2019): International Journal for Innovation Education and Research